Keel laying ceremony of Natalia Cosulich Fratelli Cosulich
Tankers

Keel laid for Fratelli Cosulich's fourth methanol-ready bunker tanker

Natalia Cosulich, the last of four IMO Type II sister ships under construction at Taizhou Maple Leaf, is scheduled for delivery in May 2027 as the group renews its Singapore bunkering fleet.

Alan Bosworth

Taizhou Maple Leaf Shipyard in China has held the keel-laying ceremony for Natalia Cosulich, the fourth and final vessel in a series of methanol-ready chemical bunker tankers for Fratelli Cosulich.

The 7,999 DWT IMO Type II tanker will have dedicated bunkering arrangements and safety systems designed for future alternative-fuel operations, Fratelli Cosulich Marine Energy said on November 18.

Steel cutting for the vessel took place at the same shipyard on February 4, 2026. The group's 2025 annual report schedules her delivery for May 2027 as part of its Singapore bunker fleet renewal programme.

The tanker is intended to carry fuel oil, biofuels up to B100 and methanol. The company has specified a phenolic epoxy coating for her cargo tanks to support the handling of specialised cargoes, including methanol.

The programme began in July 2024 with an order for two vessels and options for two more, and was increased to four vessels in January 2025.

Lead ship Anna Cosulich joined the fleet in May 2026. She was later sold to SPC Shipping, a subsidiary of PetroChina International Singapore, and renamed Vanda Pioneer in October.

Lucia Cosulich was delivered in June. The third ship, Carlotta Cosulich, was delivered for service in Singapore in late October.