NKT Eleonora Vard
Offshore Construction

NKT's new cable layer arrives in Norway for final outfitting

Gareth Havelock

NKT's newest cable laying vessel has arrived in Norway where her final outfitting will take place.

NKT Eleonora had earlier departed Vard Shipyards Romania's Tulcea facilities. Following her outfitting at Vard Brattvaag, the vessel will be delivered no later than the second quarter of 2027.

Upon completion, NKT Eleonora will have a length of 176 metres, a beam of 32 metres, and dual-fuel engines that can run on either methanol or diesel/HVO.

The vessel will be equipped with three turntables and will have a power cable-laying capacity of 23,000 tonnes. She will also host a range of subsea tooling for precise installation and service of offshore cables and will feature an ABB power distribution system.

Design work on NKT Eleonora was provided by Salt Ship Design of Norway. The vessel is being constructed in parallel with NKT expanding its site in Karlskrona in Sweden with a new high-voltage offshore cable factory. Both assets are scheduled to be operational beginning in 2027.