Angola LNG and Svitzer Angola LDA have signed a contract to supply marine services at the Angola LNG terminal to be built in Soyo, Angola.
The start-up of the contract will be September 2011, running for 20 years with options for two additional five-year extensions.
Five Svitzer S80/33 ASD tugs are under construction as well as two utility vessels, two line handlers, two patrol boats, one pilot boat and one pollution-prevention vessel.