Turbine installation completed at Northwester 2 wind farm offshore Belgium

Photo: Jan De Nul

All 23 wind turbine generators at the 219MW Northwester 2 offshore wind farm in the Belgian North Sea have now been fully installed.

In a joint operation with MHI Vestas and Jan De Nul Group, Parkwind completed the final installation of turbines at the wind farm, which is located approximately 50 kilometres off Ostend.

Installation works began in December 2019 and utilised two vessels.


Baird Maritime

The best maritime site on the web. The sea's our scene!