January 31, 2018 FEATURE: Refitted James T ready to go to work Written by Alan Haig-Brown on January 31, 2018. Posted in Harbour Tugs and Operation. This winter will see the tug James T (ex-PT Thompson) back at work after a major refurbishment. The James T, named for the founder of Campbell .. Read More
October 13, 2017 Ohio River problems continue Written by Baird Maritime on October 13, 2017. Posted in Work Boat World. Rising water levels on the Ohio River and repeated failures at Locks and Dam 52 and 53 shut down river traffic this week, queuing vessel traffic along a 80-kilometre .. Read More