Grimaldi Group takes delivery of newbuild PCTC

The pure car and truck carrier (PCTC) Grande Torino was delivered to Grimaldi Group on November 28 at the Chinese shipyard of Yangfan in Zhoushan.

This is the first of seven PCTCs in a series order by Grimaldi from Yangfan.

Grande Torino has a length of 199.9 metres, a width of 36.45 metres, a gross tonnage of 65,255 tonnes, and a speed of 19 knots.

The vessel can transport up to 7,600 cars on four vehicle decks.


Baird Maritime

The best maritime site on the web. The sea's our scene!