Woodside Petroleum has announced that the front-end engineering and design (FEED) phase of the FLNG for the Broswe gas field off Australia has begun.
The FEED phase involves finalising the costs and technical definitions for the proposed development to enable a final investment decision. It includes determining a range of details related to the commercialisation, timing and sequencing of FLNG deployment.
The Browse FLNG Development involves three FLNG facilities utilising the Brecknock, Calliance and Torosa gas fields.