Banner

Magazine Archive

FREE online issues of Baird Magazines (delayed two months):

Work Boat World 

Ships and Shipping

Ausmarine

Banner

Marine Events Calendar

<<  September 2010  >>
 Su  Mo  Tu  We  Th  Fr  Sa 
   
  
Banner

Weekly Poll

Is the offshore mariculture industry destined for big things, or is it just a flash in the pan?
 
Banner
Greenpeace orders ‘Rainbow Warrior III’ PDF Print E-mail
Thursday, 02 July 2009 23:34

Greenpeace International Executive Director Gerd Leipold yesterday signed a contract with the Fassmer Shipyard for construction of the ‘Rainbow Warrior III’.


'Rainbow Warrior III'

The sailing ship, which is to be completed in time for Greenpeace's 40th anniversary in 2011, will include the latest in green technology.

This is the first time in the Greenpeace’s history that it has chosen to commission a purpose-built ship instead of refurbishing an older one.

The ‘Rainbow Warrior III’ will be built primarily to sail with the option in unsuitable weather conditions to switch over to engine-powered, diesel-electric propulsion. The A-frame design of the mast and the positioning of the sails has been optimised for efficiency and the shape of the hull has been designed for maximum fuel conservation. Heat created by the generators will be re-used to heat water on board and for engine pre-heating.